Soho · Buildings & streets

Golden Square & its approaches

A workspace facing the garden has a different daily rhythm from a restaurant or a private flat. Around Golden Square, organise the work by the room’s use and the fabric that will remain visible.

Discuss your project
Creative studio with editing desks and large sash windows in a period building

Look beyond a Georgian assumption

The listing for 19 Golden Square describes an early-twentieth-century, stone-faced commercial building. Its older street tablet is specifically identified in the record. This is a useful reminder that an address around the square can contain fabric from different periods: distinguish stone, metal and joinery from painted backgrounds before developing an exterior or entrance scheme.

Sources: Historic England: 19 Golden Square, Grade II

A restrained setting for working rooms

For an office interior, decide which surfaces should support the work quietly and which should give a reception or meeting room its identity. Review samples beside screens, timber furniture and existing lighting. Ask the operator of any technical room to provide its requirements before selecting a colour, including the surfaces that must remain free of decoration.

Plan access above and below street level

Identify the reception arrangements, stair width and any goods-lift booking at the actual building. A basement room, a tall entrance and an upper-floor studio can require different equipment and carrying routes. Show each on the scope, with a named person responsible for releasing the space and arranging secure access while it is out of normal use.

Leave a finish schedule that supports upkeep

Allocate a room name to each wall, ceiling and joinery finish and keep the approved product references with the handover record. Where a tenancy covers only part of the building, distinguish the occupier’s choices from the landlord’s common-part specification. This makes later local repairs easier to discuss without assuming that every pale wall or dark door received the same coating.

Tell us what you have in mind

A room. A frontage.
A place to begin.

Share the Soho property address and a short outline of the work. For occupied premises, add the hours the space can be released and any instructions from the person managing the building.

Introduce your project

A little about the rooms, their condition and your intended finish will help frame the conversation.

Read our privacy policy about how we handle your enquiry.